7 Day Full + Differential Backup Job
-
I would like to configure an XCloner backup job that begins with one (1) full backup followed by six (6) differential backups. In my experience with Acronis True Image this is referred to as a “backup set.” I would like to retain some number of XCloner backup sets to provide a disaster recovery window. When the number of backup sets has been exceeded, the oldest backup set would automatically be deleted.
For example, suppose the number of backup sets was eight (8). When the ninth backup set was created, the first backup set would automatically be deleted. This would provide an 8-backup-set rolling disaster recovery window through time.
Is this possible to accomplish with XCloner v4.2.12? If so, how would I configure XCloner to perform this task?
- The topic ‘7 Day Full + Differential Backup Job’ is closed to new replies.