Change Order of Add-on Categories?
-
Currently, Add-on Categories are displayed in the pop-up order form in the order that they were created in Backend>RestoPress>Add-on Categories.
There are many instances in which new Add-on Categories are likely to be created at a later date – yet would be most helpful for customers if they appeared as the first option?
For Example, an add-on category named “Sides” is created at the same time as “Food Item: Chicken Wings”. One week later a second add-on category of “Sauces” is added to the same Food-Item. The customer is now presented an ordering experience that requires them to choose a side to go with their order before they are presented with the option of choosing which sauce they want on their wings.
Is there a way to work around this currently without having to delete all add-on categories, create them all again with the new option in the order desired, and then go into all food items and re-connect the newly created add-on categories to each food item a second time?
- The topic ‘Change Order of Add-on Categories?’ is closed to new replies.