How to change post Scheduling
-
Hi all
How Can I change the scheduling dates for posts
They are currently 17 about 8 months apart thru to 2015
Can I change them down to a week or a month or even put them on rotation?Thanks
Viewing 1 replies (of 1 total)
Viewing 1 replies (of 1 total)
- The topic ‘How to change post Scheduling’ is closed to new replies.