Sorting by post_date does not change order of posts after updating date of post
-
Changing the date of a post does not move it down in the directory list, instead moving it to the first location, appearing as if the directory is sorting by
post_modified
. Is it possible to instead sort by the date of the post?Below is the shortcode used for the directory:
[webdirectory-listings categories=134 perpage="20" hide_order="1" hide_count="1" hide_paginator="0" show_views_switcher="0" order_by="post_date" order="DESC"]
Viewing 1 replies (of 1 total)
Viewing 1 replies (of 1 total)
- The topic ‘Sorting by post_date does not change order of posts after updating date of post’ is closed to new replies.